Construction schedule of values software

A Schedule of Values that locks your contract sum into billable lines

Break your head-contract sum into the line items you bill the client against, optionally seed them straight from the estimate, then freeze the baseline so every progress claim runs against a locked, agreed figure.

Schedule of ValuesNorthside Apartments · Head contractBaselined4 billable linesContract sum · $4,850,000.00
Lines total
$4,850,000.00
Contract sum
$4,850,000.00
Delta
$0.00
Balanced
#DescriptionCost codesScheduled value
1Concrete03-100$2,274,253.42
2Electrical16-100$1,856,997.24
3Finishes09-100$676,249.34
4Additional balcony waterproofing — client-approved scope additionNo cost code$42,500.00
Lines total ex GST · equals the contract sum$4,850,000.00

The $4,850,000.00 head-contract sum broken into the billable schedule-of-values lines the client is claimed against, each mapped to cost codes and seeded from the won estimate. Lines total equals the contract sum to the cent, and the baseline is frozen — every progress claim bills against these locked lines, period by period.

Trusted by builders across the country

From custom-home builders to commercial head contractors, teams run their projects on BuildPass.

JCG
JCG

The figure you bill against should be the figure you signed

Bill from the contract, not a copy

The breakdown you bill from and the sum you signed are the same object, with no re-keyed workbook that drifts.

Seed from the estimate

Snapshot the schedule from your estimate as a point-in-time copy, so later estimate changes don't move your contract sum.

Freeze the baseline

Lock the contract sum through a deliberate ceremony, so every claim is measured against an agreed figure.

Everything the SOV needs, before you claim

From breaking down the contract sum to a frozen baseline you bill against.

Schedule of ValuesBillable lines
03-100Concrete$2,274,253.42
16-100Electrical$1,856,997.24
09-100Finishes$676,249.34
Additional balcony waterproofing$42,500.00
Contract sum$4,850,000.00

Break the sum into billable lines

Split your head-contract sum into the line items you claim against.

Seed from estimate
Won estimate$4,412,000.00
snapshot
Schedule of values$4,850,000.004 billable lines seeded · point-in-time

Seed the SOV from your estimate

Opt in to snapshot the schedule from your estimate, carrying line items and values across.

Baseline
Drafteditable
BaselinedLocked 03/07/2026
Contract sum · frozen$4,850,000.00

Freeze the baseline

Set the baseline through a deliberate ceremony that locks the contract sum.

Line itemsPre-baseline
03-100Concrete$2,274,253.42
16-100Electrical$1,856,997.24
09-100Finishes$676,249.34

Manage line items

Structure and adjust the breakdown before you freeze it, so the lines are right when you baseline.

MoneyHeld to the cent
Additional balcony waterproofing
Ex GST$42,500.00
GST 10%$4,250.00
Inc GST$46,750.00
GST applied at the boundary

Keep money exact

Values are held precisely and ex-GST, with GST resolved at the boundary.

Progress claim basis
LineScheduled
03-100Concrete$2,274,253.42
16-100Electrical$1,856,997.24
Frozen baseline · claims bill against this$4,850,000.00

Set up downstream billing

The SOV is the sell-side foundation your progress claims draw on from day one.

The SOV is the sell-side counterpart to the budget

Where the budget breaks down what the job costs you, the SOV breaks down what you bill the client, and both can be seeded from the same won estimate. Once the SOV baseline is frozen, it becomes the agreed figure your progress claims bill against, completing the Win-to-Pay line from first price to every claim you raise.

Explore the platform
Won estimate
$4,412,000
Northside Apartments · one priced scope
seeds
Schedule of values · sell-side
$4,850,000
head-contract sum billed to the client
Budget · cost-side
$4,412,000
same cost codes, tracks cost to complete

Frequently asked questions

No. You can opt in to seed the Schedule of Values from your estimate, carrying line items and values across, or build it directly if you prefer.

No. Seeding takes a deterministic point-in-time snapshot of the estimate. Later estimate changes don't move your SOV, so the contract sum stays the figure you agreed.

It locks the contract sum at the agreed figure. After the baseline ceremony the sum is fixed, and every claim is measured against that locked value.

Values are held ex-GST and to the cent, with GST resolved at the boundary, so your billable line items stay clean and precise.